SYSTEM CONSTRUCTION PROJECT IN DA LAT NEOLOY.

1.PROJECT BACKGROUND:Owner: LTD FOUR SEASONS. Contractor: Construction Company Ltd Phuc Thinh. Provider of technology solutions Neoloy: CORPORATION JIVC. Project Name: Infrastructure Resort - Spa Terracotta Four Seasons. Place of execution: Tuyen Lam Lake tourist area - Da Lat - Lam Dong. - Category: Wall retaining Neoloy / Neoloy. - Construction period: Expected time of deployment Retaining wall construction Neoloy item from 15/05/2011 - 15/06/2011.

2. INFORMATION ABOUT THE ITEMS RETANING WALL NEOLOY / NEOLOY

-The entire system of road traffic infrastructure Resort-Spa resort includes 02 branch Terracotta A (L = 791.40m) and B (L = 415.59m) with a total route length 1206.99m. Cross section of the gland largely takes the form half peach half covered. Neoloy retaining wall are arranged side slopes filled up and digging

- Neoloy retaining walls have very high requirements in terms of both technical as well as aesthetic. Of these requirements is important to create a textured wall  "Green" for resort - Retaining wall height: 2 - 3m

- Walls Length: Approximately 380-400 m

- Total volume Neoloy applied: Approximately 6,000 m2

- Material Neoloy / Neoloy used in this project are: network systems FACIAL NEOWED cell compartment / NEOLOYTM PRS 660-200; Cell compartment size: 420x500mm; Cell compartment height: 200mm; Distance weld: 660mm

- Construction project video: