APPLICATION PILOT ROAD SURFACE IN NEOLOY REINFORCED DONGNAI
Project information
- Projects: Pilot Application Neoloy reinforced pavement in Dong Nai (2014).
- Location: Long Khanh town, Dong Nai Province.
1. Challenges of the project
- Vehicular traffic running through the high road with large loads.
- Appearance of potholes and large cracks
2. Information solutions Neoloy Use a 356-100 Neoloy be to backfill with crushed stone 12cm high.
3. Benefits of the solution Neoloy Technically.
The solution helps to support good Neoloy roadbed load transmitted to the ground a wider. At the same time restrictions by the unconfined of of granular material left the should increase the elasticity module for the pavementg
Economic terms: Make use of local materials should be the economic savings.
Regarding Construction: Significant reduction in construction time
About exploitation and use: The solution can Neoloy traffic immediately after finishing thereby significantly reducing the time division lanes, ensuring favorable mining
4.Neoloy construction process reinforced pavement video