PROJECT CA LO DIKES – SOC SON – HA NOI

Slip handle urgent dam erosion upstream from Km17 + 050 to Km 17 + 100 dikes Ca Lo and 25 kms + 700 dikes Huu Cau, Soc Son District, Hanoi Performance venues: Soc Son District, Hanoi

1.Project information.

- Name of project: Urgent treatment projects upstream dam sliding roof slides from Km17 + 050 to km 17 + 100 Ta Ca Lo dikes and Km25 +700 Huu Cau dikes, Soc Son District, Hanoi

- Performance venues: Soc Son District, Hanoi

- Year: Month 11/2016

+ Owner: Department of Agriculture and Rural Development in Hanoi.

+ Design Consultancy: consultancy centers and technology transfer General Department of Water Resources.

+ Contractor: Company Limited Hieu Nam.

2. Solution application.  

- Use Neoloy 660-120, prevent cell size 420x500mm, solder joints 660mm, height 120mm, for reinforcing the entire dam and insert 14cm thick grass land.  

- Arrangement with stone drain ditch construction.

3. Benefits of the solution Neoloy    

Economics: Cost Effective.    

Technique: The system prevents network cell Neoloy 3D forming flexible system capable of withstanding earthquakes.    

Application: Fast, easy, utilizing local manpower, reduce equipment requirements, traffic at the site.    

Longevity: Longevity, environmentally sustainable.

4. Comments:   

 Construction projects accelerated and quality assurance.    

After completing Neoloy solution will bring a stable slope and "Green" environmentally friendly